Architects
We sit with your design team early to translate design intent into buildable, code-compliant plans. Constructability and cost feedback happen before drawings are finalized — not after a bid comes back over budget.

Architects, engineers, city plan check, landlords, property managers — a tenant improvement has a dozen moving pieces. SEFAIN manages every one of them, so owners and tenants get a finished space on schedule without chasing anyone.
Get a Free ConsultationSEFAIN Construction Group delivers tenant improvements across Southern California — office buildouts, retail spaces, restaurant conversions, and medical and professional suites. We work directly from your work letter and lease exhibits, build the scope around the allowance, and carry the project through permitting, construction, and final sign-off. Whether you are a landlord turning a vacant suite or a tenant opening a new location, you get one accountable team and one clear line of communication.
120+
TI Projects Completed
3–5 Wks
Avg. Time Saved on Permitting
96%
On-Time Completion Rate
4.9/5
Client Satisfaction
A project only moves as fast as its slowest conversation. SEFAIN keeps every party aligned — designers, engineers, inspectors, and building management — so nothing falls through the cracks and no one waits on an answer.
We sit with your design team early to translate design intent into buildable, code-compliant plans. Constructability and cost feedback happen before drawings are finalized — not after a bid comes back over budget.
Structural, mechanical, electrical, and plumbing scopes get coordinated against one another and against the base building. We resolve conflicts on paper so nothing gets missed in the ceiling.
We manage submittals, plan-check corrections, and inspection scheduling from application to final sign-off. Comments get turned around fast so your permit keeps moving instead of sitting in a queue.
Clear, constant communication on work letters, building rules, and after-hours access. Lease terms, allowances, and base-building requirements are respected at every step, with documentation to match.
Every SEFAIN tenant improvement starts with a milestone schedule and a line-item budget that both the tenant and the landlord can see. We track progress against that baseline every week, flag risks before they become delays, and bring solutions with pricing attached instead of excuses. If something changes, you hear it from us first — in writing, with options.
A written recap with photos, completed milestones, and the next two weeks of look-ahead — to both tenant and landlord.
Line-item cost reporting with allowances, change orders, and remaining contingency visible at all times.
Long-lead items, utility conflicts, and inspection risks are flagged weeks early with options and pricing attached.
We read the work letter and lease exhibits, confirm what the landlord delivers versus what the tenant funds, and define a scope that fits the allowance.
Design, structural, and MEP teams are aligned on one coordinated set so plan check and field work run without conflicts.
We handle submittals, respond to plan-check corrections, and schedule inspections to keep approvals on the critical path.
Buildout proceeds under building rules and approved hours, with weekly reporting to tenant and property management.
Punch list, final inspection, certificate of occupancy, and a complete closeout package with warranties and as-builts.
A sample of office, retail, restaurant, and medical spaces delivered across Los Angeles, Orange County, and Ventura County.






“We own six buildings and Sefain is the only contractor we hand a vacant suite to without babysitting it. Permits, our engineers, our property manager — Fady kept all of it moving and we delivered the space two weeks before the lease commenced.”
Daniel K.
Property Owner — Los Angeles, CA · Office TI
“Our architect changed the layout mid plan-check and I braced for a delay. Sefain had the corrections resubmitted within days and never let it touch our opening date. The weekly reports meant I always knew exactly where the money stood.”
Alicia M.
Restaurant Owner — Pasadena, CA · Restaurant Conversion
“As the property manager I get pulled into every TI headache. Not this one. Building rules were followed, after-hours work was scheduled properly, and tenants upstairs never called me once.”
Robert T.
Property Manager — Sherman Oaks, CA · Medical Suite
Send over your lease exhibits or plan set and we will walk you through scope, schedule, and budget — no cost, no obligation.
Lic# 1151622